Tema Engineering Works

Our modern manufacturing facility is installed with high-end machines and technology that are required for fulfilling the bulk requirements of customers.

Infrastructure & Facilities

Our Infrastructure

We have a well-developed infrastructure facility that comprises of manufacturing unit spread over an area of 12000 Sq. ft. Besides this, it also has a 10000 Sq. ft vast fabrication shop covered area and an underfloor open space in 2000 Sq. ft. Various other units like quality testing, research & development and warehousing are also included in the infrastructure. The entire functioning of these units is handled by immensely qualified team members thus, bringing forth finest quality Reactors, Coils, Vessels and Related Products.

Following are the machines installed at our unit :

Plate Bending Machine- 25 mm x 2000 Plate Bending Machine – 50 mm x 2500 mm (Sub Contractor)
Fully Automatic Tube Expanding Unit 3/8" to 2" Capacity Air Plasma Cutting – 50 mm Capacity
Argon Arc Tig Welding Unit Hydraulic Press - 500 Ton Capacity.(Sub Contractor)
Grinders - types AG7, GQ4, Flexible Shaft Welding Rectifiers
Lathe - 350 mm swing - 6' Bed Lathe - 1400 mm swing - 10' Bed 20 ft.
Pipe Bending Machine - 3" Capacity Hacksaw - 10" Capacity
Radial Drilling Machine 40 mm x 750 mm swing Pug Cutting Machine
Electrodes Drying Oven Passivisation Facilities
Shaping 15 Stroke Hydraulic Hand Test Pressure Pumps
Portable Blower Air Compressor - 4 kg/cm. sq.
Buffing facilities to Mirror finish -

Research And Development

A separate research and development unit has been developed by us that is managed by highly qualified researchers. These experts conduct extensive research, market surveys and analysis to come up with innovative ideas of production and products. It also helps in understanding the prevailing market standards that enables us to work towards the same. The improvements are adopted at every stage of the business process so as to work in compliance with the latest standards. This department is also beneficial in having maximum production with judicious utilization of all the available resources.